Mastership
17
OFFSHORE
gas production and distribution platforms constructed
OFFSHORE
Scarabeo 4
a semi-submersible drilling rig, first of such type at Viktor Lenac, was renewed in only 88 days. Daily, about 200 to 300 workers and engineers were transported to the main deck, at 40 meters above sea level, by two elevators, which were installed on the rig's red leg. A total of 26,000 cum of suspended scaffolds were raised onboard the rig. MORE